Weekly Trails Report – June 28, 2020

1) Trail Maintenance (Volunteers):

  • Volunteers cleared overgrown vegetation on High Meadow Trail and Docmann Trail

2) Outlook for the week ahead:

  • Volunteers will be continuing vegetation maintenance of trails.

If there are questions or comments, please contact Volunteer Trail Coordinators Dan Mullins and Mark Celusniak at trails@kcranch.org.
______________________________________________________________________________________________________

Weekly Trails Report – June 21, 2020

1) Trail Maintenance (Volunteers):

  • Volunteers finished the work on the Lark Bunting connector. Staff installed fencing to close off the old trail segment.
  • Volunteers worked on clearing overgrown vegetation throughout the system according to zone responsibilities and moved tarps and first aid kits to the boxes.

2) Outlook for the week ahead:

  • Volunteers will be continuing vegetation maintenance on the foothills trails as well as some of the lower valley sections.

If there are questions or comments, please contact Volunteer Trail Coordinators Dan Mullins and Mark Celusniak at trails@kcranch.org.

______________________________________________________________________________________________________

Weekly Trails Report – June 15, 2020

1) Trail Maintenance (Volunteers):

  • Volunteers removed a down tree from Bradford Trail
  • Volunteers worked on clearing overgrown vegetation on Golden Banner Trail, High Meadow Trail, and Shaffer Trail.

2) Outlook for the week ahead:

  • Volunteers will be continuing vegetation maintenance on the foothills trails.
  • Volunteers will be completing the trail reroute from Lark Bunting trail to North Hogback trail

If there are questions or comments, please contact Volunteer Trail Coordinators Dan Mullins and Mark Celusniak at trails@kcranch.org
_______________________________________________________________________________________________

Weekly Trails Report – June 8, 2020

1) Trail Maintenance (Volunteers):

  • Volunteers worked on construction of the trail reroute from North Hogback Trail to Lark Bunting Trail. The trail reroute is 90% complete and the old trail has been closed.
  • Volunteers removed a down tree from South Shaffer Trail.

2) Outlook for the week ahead:

  • Volunteers will be working on vegetation maintenance on the foothills trails.

If there are questions or comments, please contact Volunteer Trail Coordinators Dan Mullins and Mark Celusniak at trails@kcranch.org

_________________________________________________________________________________________________

Weekly Trails Report – May 24, 2020

1) Trail Maintenance (Volunteers):

Volunteers performed the following maintenance this past week:

  • Picked up trash along trails, in parallel with the Adopt-a-Road day.
  • Collected rocks for use in armoring a section of South Shaffer to be installed by Singletrack Trails.
  • VTCs and volunteers moved tool storage boxes with tools into position in the agreed upon locations in the backcountry.
  • Completed the build out of the new Volunteer Tool space in the Dakota Lodge barn, with a workbench, shelves, hooks, lights and secure door.
  • VTCs finished organization of the new shed after the tools were deployed to the field.

2) Trail Maintenance (Contractor):

Singletrack Trails performed maintenance of the following trails this past week:

  • High Meadow Trail, armored tread near rock outcrops
  • High Meadow Trail, repaired tread cupping at west end of trail, added drains and grade reversals in the aspens.
  • South Shaffer Trail, cleaned and/or added 8 drains, also added new armor section in drainage (using rocks volunteers collected) south of High Meadow Trail intersection.
  • South Shaffer Trail, armored two sections of trail, one north of saddle, one south of saddle, and cleaned up trail south of the saddle.
  • South Shaffer Trail, removed a large dead down tree
  • The work of South Shaffer was made more efficient by gaining access via one of our West Ranch neighbors, who allowed access across his property.
  • Singletrack Trails is now wrapped up for the season with their portion of maintenance, on budget as the VTCs gave guidance along the way to prioritize the remaining work.

3) Outlook for the week ahead:

  • VTCs will be sending instructions to the section leaders (there are 11 this year with the trail network divided into smaller chunks) so they are ready to work with their crews when vegetation maintenance season begins. Vegetation maintenance work will start soon.

If there are questions or comments, please contact us at trails@kcranch.org.

Dan Mullins and Mark Celusniak
Volunteer Trail Coordinators

___________________________________________________________________________________________________

Weekly Trails Report – May 17, 2020

1) Volunteer Trail Maintenance:
• Volunteers added rock armoring where Docmann Trail crosses the creek and added granular soil to the trail to mitigate seasonal mud.
• In prior weeks, volunteers performed initial vegetation maintenance on selected trails and removed loose rocks from trails.

2) Contractor Trail Maintenance:
• Singletrack Trails performed maintenance on the following trails this past week:
• Massey Draw Trail, at the intersection with Colorow Trail, repaired two drainage features
• Stove Prairie Trail, added a drainage feature at Ptarmigan access
• North Shaffer Trail, at Manor House intersection, corrected & redesigned drainage
• North Shaffer Trail, 250 yards below top, repaired erosion with new rock armor
• Bradford Trail, above Domino Trail, improved drainage and mitigated erosion
• Bradford Trail, just below Beacon Hill / Summit View intersection, armored perennially wet section and improved drainage feature
• Colorow Trail, near Lost Canyon Trail, provided better tread definition and placed anchor rocks
• Summit View Trail, repaired erosion, added rock armoring
• Cougar Trail, minor tread repair, 3 locations
• Golden Banner Trail, minor tread and drainage feature repair, 2 locations

3) Outlook for the week ahead:
• Singletrack Trails will continue trail maintenance, with a smaller crew. Work will include maintenance on High Meadow Trail and South Shaffer Trail. All maintenance work is intended to mitigate erosion on short sections of trail.

If there are questions or comments, please contact us at trails@kcranch.org.

Dan Mullins and Mark Celusniak
Volunteer Trail Coordinators